R E FL E X exhibition project Art & Design Gallry 7-9 Feb 2012
Exhibition to go up Mon 6th/Tue 7th Feb. Tbc.
First briefing/meeting 12.00 Tue 24th January 2012, AB145 Studio. I will explain the project and check on the initial ideas for the exhibition design (from Project Week 16-20 Jan). Please make sure you are prepared for this very short and sharp project. £100 budget.
You must obtain a plan of the Gallry space asap - some of you already have these from lev 4 projects last year.
Groups will be allocated shortly. Look out for emails.
Tue 31/1/2012 - studio 10am - decisions and materials - drawing of space and proposal
Thu 2/2/2012 - AB146 2pm - present finial proposal to Screen Cultures students and tutor
More later.. For now, please make sure the above is in your diary and work has begun.
Friday, 20 January 2012
Tuesday, 17 January 2012
Reflex exhibition design
R E F L E X
This is a very short group project designing exhibition design concepts for an exhibition of work by students from the Screen Cultures Programme.
The public exhibition opens Tuesday 7th February 2012, open until 9th February 2012.
This is a very short group project designing exhibition design concepts for an exhibition of work by students from the Screen Cultures Programme.
The public exhibition opens Tuesday 7th February 2012, open until 9th February 2012.
REFLEX is a vibrant
short live project that showcases work by Screen Cultures students. It has
become a tradition that IAD students design and set up the exhibition. It is a
very low budget (£100) and therefore a lot of imagination is absolutely
necessary. Less is more.
You need to produce drawings; plans, sections, visuals,
diagrams and materials information. Instructions need to be in place for the
installation.
You will work in groups – each group coming up with ONE design concept
for the exhibition. This is also a Student Competition, where the most
innovative and suitable exhibition design wins and gets to build the
exhibition. The idea for the group concepts should come from the work that was
carried out during PROJECT WEEK (individual exhibition research).
You need to consider the various constraints (heights,
widths etc) depending on the ‘station’ activity.
Health & Safety, risk assessment etc.
The Screen Cultures students will produce in a group,
an interactive object or environment, which is designed to be exhibited in a
public gallery context.
The artefact should not use conventional input and/or
output methods to establish relationships with its users and may explore
concepts of sensing and/or actuation which have been covered in class or may be
based on techniques and materials your group has researched.
Tue 24.1.12 Meeting
with Heidi AB145 – check on Project Week activities – groups assigned.
Tue 31.1.12 Studio
project work ALL DAY – ideas and concepts into place. Agreed, materials and
costs to be complete for installation 6/7th Feb.
Thu 2.2.12 Present
concepts to Client. This is a formative assessment point. Competition –
selection
of winning concept. (All students/groups to help set up the chosen design).
Mon 6th Feb Work
on any final designs/materials/instructions. Compile group document.
Mon 13th Feb Exhibition
take-down. Group 2 delegate tasks to all 1.30pm.
Submission
requirements:
Tuesday 7th
Feb 2012, AB145, 4pm.
A3 group document outlining the concept, instructions,
materials, cad drawings.
PDF presentation for client to be shown 2nd Feb
2012 aim for approx 8 slides.
Document to be clearly labelled and including a group work
evaluation.
All group submissions to contain the Study Week individual
research.
This submission forms part of the Design Studio module.
Subscribe to:
Posts (Atom)